Interior Spaces Built Ready for Finish

Finish and rough carpentry services delivered across Pontiac and surrounding Michigan communities by LLT Construction, Inc.

When your project in Pontiac involves interior reconfigurations or build-outs, you need framing and finishing work that lines up correctly and stays on schedule. Metal stud framing creates the structural interior walls that define rooms, corridors, and office layouts, and when done properly, those frames sit plumb and ready for drywall without adjustments or delays. Llt Construction, Inc. handles both rough carpentry that establishes your layout and finish carpentry that prepares surfaces for paint and final installation, working across Pontiac, Rochester, Auburn Hills, Waterford, Bloomfield Hills, Southfield and surrounding areas.


The scope includes metal stud framing for spaces undergoing reconfiguration or renovation, drywall installation and finishing for residential and commercial interiors, and acoustic ceiling systems that support sound control and a clean overhead appearance. Work is coordinated to fit your timeline, maintain jobsite organization, and allow paint crews and finish contractors to begin as soon as surfaces are ready. All self-performance services are provided within the Michigan service area listed, with crews familiar with local building expectations and coordination requirements.


If you are planning an interior renovation or tenant fit-out in Pontiac or nearby areas, reach out to discuss your layout and timeline.

Framing and Drywall Coordinated Around Your Schedule

Your project in Pontiac or a surrounding area begins with layout verification and stud placement that defines each  according to your approved drawings. Metal stud framing goes up using measured cuts and fasteners that hold alignment through drywall installation, electrical rough-in, and insulation placement. Drywall panels are hung, taped, and finished in stages, with joint compound applied and sanded to create smooth surfaces ready for primer.


After the final coat is sanded and wiped down, you will see walls with even texture, clean corners, and no visible seams or fastener dimples under angled light. Acoustic ceiling systems are installed using grid supports and ceiling tiles selected for the space, providing overhead coverage that absorbs sound and conceals mechanical runs. Each installation is coordinated so that other trades can proceed without waiting on incomplete sections or needing rework around framing errors.


The work stays organized with materials staged to avoid blocking access and debris removed at the end of each phase. Standards are followed for fire-rated assemblies, moisture-resistant drywall in appropriate zones, and ceiling clearances that meet local code. The service does not include exterior framing, structural load adjustments, or finish painting, but transitions the space into a state where those final steps can begin immediately.

Questions About Framing or Finish Work Are Common

Homeowners and project managers often want to know how long the work takes, what materials are used, and how the schedule aligns with other contractors on site.

What does metal stud framing involve for an interior build-out?

Metal stud framing uses steel tracks fastened to the floor and ceiling, with vertical studs placed at measured intervals to form walls and partitions. The framing is plumb and square, ready for drywall attachment and utility rough-ins.

How long does drywall finishing take before painting can start?

Drywall finishing typically requires three coats of joint compound with drying time between each application, followed by sanding. You can expect surfaces to be paint-ready within several days depending on humidity and ventilation.

Why are acoustic ceiling systems used in commercial spaces?

Acoustic ceiling systems reduce sound reflection, hide ductwork and wiring, and provide a uniform finished appearance overhead. They are common in offices, conference rooms, and spaces where speech clarity and visual consistency matter.

What areas in Michigan does Llt Construction, Inc. serve for carpentry work?

Self-performance services are provided in Pontiac, Rochester, Auburn Hills, Waterford, Bloomfield Hills, Southfield and throughout Oakland, Macomb, and Wayne County. All rough and finish carpentry work is completed by crews familiar with local building practices and coordination timelines.

When should I schedule carpentry work during a renovation?

You should schedule rough carpentry after demolition and before electrical or plumbing rough-ins, and finish carpentry after all utilities are installed but before painting begins. Proper timing keeps each trade moving without delays.

Llt Construction, Inc. coordinates framing, drywall, and ceiling installation to support smooth transitions between trades and keep your project moving forward. If your space in Pontiac or the surrounding area is ready for interior build-out or reconfiguration, get in touch to review your layout and schedule.